Location:
  
  
  
  
  
  
    
      
        
          
            Yatala, Queensland
          
        
      
          
  
  
  
  
  
      
  
  
    
      
  
  
  
  
  
      Client:
  
  
  
  
  
  
    
      
        
          
            Manhole Form Hire
          
        
      
          
  
  
  
  
  
      
  
  
    
      
  
  
  
  
  
      Related Services:
Related Products:
Duration:
  
  
  
  
  
  
    
      
        
          
            2016
          
        
      
          
  
  
  
  
  
      
  
  
    
      
  
  
  
  
  
      Supply and install of Pol-3 32mm Polair Air Pipe along the tilt slab wall with GF-25 clips fixed with tap-in anchors and along the crane-rail with PC25S purlin clip assemblies. Socket fusion and compresion were used to complete the job and keep it out of the way of the moving electronic and manual crane systems. Droppers are a mixture of WP-2 Manifolds and Genuine Dual Nitto Outlets. 




